The tech pack checklist factories actually ask for
Most sampling failures are specification failures. Here is what a factory needs before it can quote or build.
A tech pack is the document a factory quotes and builds from. When it is incomplete, you pay for it in extra sample rounds and in a bulk delivery that does not match what you approved.
At a minimum a factory needs: a technical sketch with construction detail, a full points-of-measure sheet with tolerances, a graded size specification, a bill of materials naming every fabric and trim with references rather than descriptions, labelling and packing instructions, and a stated quality standard including the defect classification.
The single most common gap is tolerance. Approved means nothing unless the factory knows how many millimetres of variation is acceptable at each point of measure, and which sample is the gold seal that bulk must match.
The Product Development & Quality work completes the specification and sets the sampling gates so the process ends instead of drifting. Download the factory questions list to pressure-test a supplier before you commit.
Make the product buildable, repeatable and worth the price on the tag.
A specification the factory can quote from, a sampling process that ends, and a quality standard that survives the second production run.
See the service